20t/H Cement Clinker Grinding Plant

Product Details
Customization: Available
Application: Construction, Mineral Operation
Certification: CE, ISO
Manufacturer/Factory & Trading Company
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2003-03-18
Registered Capital
2.96 Million USD
Find Similar Products

Basic Info.

Model NO.
20tph
Customized
Customized
Automatic Grade
Automatic
Installation
Engineer Responsible
Price
Negotiate
Motor
China Famous Brand
Spare Parts
Supply
Transport Package
Standard Container
Specification
20t/h
Trademark
Hengxing cement clinker grinding plant
Origin
China
Production Capacity
100sets One Year

Product Description

20t/h Cement Clinker Grinding Plant :
MANUFACTURING PROCESS FOR CEMENT
The Clinker Grinding Plant requires the following raw materials:
Clinker
Gypsum
Additives

The Clinker is procured from Clinker Grinder Unit from India, China, Indonesia, Gulf and European counties. The mined Gypsum is available in local market. The additives are very important and vary with application of Cement. Generally, Slag of Iron Industry is used for making Slag Cement and Over Burnt Bricks / Fly ash from Thermal Power Plants are used to make Pozzolona Cement. The additive is selected on the basis of availability, economy and of course the demand of specialty Cement. All the raw materials are tested in laboratory for the quality before use.

All the raw materials are crushed with the help of Jaw Crusher if they contain lumps. The feed size for the Cement Mill should be less than 25 mm The raw materials are fed into their respective hoppers with the help of Belt Conveyor Or elevators. The hoppers are fitted with feeding systems which are connected with auto measuring and control system(Weighing Trolley). The measured quantity of raw material is discharged on a weighing Trolley/ conveyor belt. The weighing trolley/ conveyor belt carry the mixed material to the discharge hopper. The material from discharge hopper is taken to the elevator to feed into the Mill feed hopper. The discharge of the feed hopper is controlled by an adjustable speed rotary feeder. The feed of the mill can be varied as per the requirement. The rotary feeder discharge the material in to the Cement Mill. There are three chambers in the Mill. The chambers are filled with grinding Media ( balls & Cylpebs). The material is ground fine ( 3500 Cm2/gm.). The cement is discharged from the mill to the elevator to fill it in the Storage / Aeration Silo. The silo is fitted with compressed air coils. The air cools down the cement in the silo. The cooled Cement is packed with the help of packing machine in 50 Kg. Bags. The final product is tested from the bags for the quality and quantity and other parameters as per the statutory requirements provided by the Government.
20t/H Cement Clinker Grinding Plant
Contact:
Ms Sara Pang
Mobile phone : : 0086137 8347 1727
 
 

Hengxing Factory :
20t/H Cement Clinker Grinding Plant

20t/H Cement Clinker Grinding Plant
20t/H Cement Clinker Grinding Plant

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier