Copper Ore Flotation Processing Plant Advantages
1.High-strength flotation equipment wear-resistant materials, small loss, long using life
2.From a technical point to ensure high efficient energy-saving production line, flotation machine energy-saving up to 60%, flotation agent dosage decreased by 20%, recovery rate increased 1% to 5% more than others in the same industry
3.Achieve the water recycling, reduce water consumption, and reduce waste water discharge, reducing the normal production of mine environmental hazards. Greatly reducing the cost of customer investment cost
200t/d Copper Ore Beneficiation Equipment:
Device name | Specifications | Motor Power (kw) | Number (set) |
Jaw crusher | PE-400×600 | 30 | 1 |
PEX-250×1000 | 37 | 1 | |
Vibrating feeder | JZ-3 | 5.5 | 1 |
Ball mill | MQ1830×3600 | 135 | 1 |
Spiral classifier | FG-1200 | 5.5 | 1 |
Mixing barrel | Φ1500 | 3 | 1 |
Φ1500 | 3 | 1 | |
Flotation machine | SF1.2X4 | 88 | 4 group |
SF0.62X4 | 24 | 2 group | |
Belt conveyor | Length according to the site conditions |
Our service
Hengxing equipment can provide turkey service for customers, such as engineering consultation, engineering design, equipment manufacturing, packing & transportation, installation & commissioning personnel training etc.
About Spare Parts
Hengxing equipment will be dedicated to provide our customers with genuine spare parts with high quality. With our technological advice, the life cycle of your machine can be prolonged and sustained significantly with high effectiveness.
About Training
Hengxing equipemnt could offer excellent facilities and comfortable environment and training services to different customers. The training should include product training, safety training, operation training, maintenance know-how, technical know-how training, and regulations training, etc. All of the training is customized to fulfill every customer's expectations. Training programs can be conducted in our workshop, or at customer's site.
About Installation and Commissioning
Hengxing equipment are able to guide the overall installation of whole set production line, including crushing production line and cement equipment production line, etc., which will allow you to start the normal operation of equipment immediately. After installation,we will make inspection of the whole machine commissioning and operation condition and provide you testing data report of installation.