Customization: | Available |
---|---|
After-sales Service: | Long Life Time |
Warranty: | Long Life Time |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production capacity:1-500T/H Notice: this capacity is mean value and the specific production capacity is subject to clients'actual equipment configuration.
[Processable Material]:granite marble basalt iron ore cobble shale bluestone coal cobblestone construction material.
[Range of Application]:mining metallurgy constrction material highway railway water conservancy chemical engineering industry.
Gold ore crusher structure:
Jaw crusher is mainly made of movable jaw plate, fixed jaw plate, side plate, flywheel, eccentric shaft and toggle plate, ect. The design offer owners the highest possible fatigue, excellent and numerous install ation possibilities. This combined with high-quality components, means indisputably high crusher availability, cost-efficient crushing and low cost per ton.
Gold ore crusher Working principle:
gold ore crusher crusher machine-Jaw crusher takes motor as the driving motive.The motor, through belt and flywheel, drives the eccentric shaft to rotate. The eccentric shaft will drive the movable jaw plate move at a regular track, closing and far away from the fixed jaw plate regularly. Therefore , the materials in the crushing cavity comprised of fixed jaw plate, movable jaw plate, and side plates can be crushed and then discharged from the discharge opening. The structure of jaw crusher contains the frame, eccentric shaft, big belt pulley, flywheel, movable jaw, side guard plate, toggle plate, rear seat of toggle plate, modulation gap screw, returning spring, fixed jaw plate and movable jaw plate, etc. among which the toggle plate is used for safety.
Main benefits of the gold ore crusher
1.Simple structure with reliable performance;
2.High reduction ratio with even final particles;
3.Easy to operate with low maintenance;
4.Flexibility with wide application.
PE jaw crusher is the major crushing equipment used as primary crusher in mining and quarrying industry. PE series jaw crusher is an economic and practical crushing equipment machine for our clients.
Gold ore crusher specification :
model | Max feeding size (mm) | adjusting range of discharge opening (mm) | capacity (t/h) | spindle speed (r/min) | motor power (kw) |
PE150X250 | 125 | 10-40 | 2-6 | 285 | 5.5 |
PE200X300 | 165 | 20-70 | 5-15 | 285 | 7.5 |
PE250X400 | 210 | 20-80 | 8-35 | 310 | 18.5 |
PE400X600 | 340 | 40-90 | 15-60 | 300 | 30 |
PE500X750 | 425 | 50-100 | 40-110 | 275 | 55 |
PE500X900 | 425 | 50-100 | 55-160 | 255 | 55 |
PE600X900 | 480 | 75-200 | 90-180 | 250 | 75 |
PE600X1200 | 480 | 75-200 | 100-360 | 250 | 75 |
PE750X1060 | 630 | 80-200 | 110-320 | 250 | 90 |
PE900X1200 | 750 | 100-200 | 220-450 | 250 | 110 |
PE1200X1500 | 1000 | 100-260 | 400-800 | 300 | 160 |
PEX150X500 | 125 | 10-40 | 8-18 | 300 | 11 |
PEX150X750 | 125 | 10-40 | 8-22 | 300 | 15 |
PEX250X750 | 210 | 10-50 | 15-35 | 300 | 22 |
PEX200X1000 | 160 | 10-55 | 11-36 | 300 | 22 |
PEX250X1000 | 210 | 15-55 | 16-50 | 300 | 30 |
PEX250X1200 | 210 | 15-60 | 18-60 | 300 | 37 |
PE1000X12000 | 850 | 195-265 | 312-430 | 200 | 200 |
FAQ
if you are not sure which crusher you need,please go choosing tips to better meet your needs please provide the following information:
1.What kind of stone you want to crusher and maximum size of the feed stone?
2.maximum size of the discharge stone?
3.capacity(tons per hour)
4.Do you only need the crusher machine or the whole stone crushing line.
gold ore crusher working site:
Our service
Hengxing equipment can provide turkey service for customers, such as engineering consultation, engineering design, equipment manufacturing, packing & transportation, installation & commissioning personnel training etc.
About Spare Parts
Hengxing equipment will be dedicated to provide our customers with genuine spare parts with high quality. With our technological advice, the life cycle of your machine can be prolonged and sustained significantly with high effectiveness.
About Training
Hengxing equipemnt could offer excellent facilities and comfortable environment and training services to different customers. The training should include product training, safety training, operation training, maintenance know-how, technical know-how training, and regulations training, etc. All of the training is customized to fulfill every customer's expectations. Training programs can be conducted in our workshop, or at customer's site.
About Installation and Commissioning
Hengxing equipment are able to guide the overall installation of whole set production line, including crushing production line and cement equipment production line, etc., which will allow you to start the normal operation of equipment immediately. After installation,we will make inspection of the whole machine commissioning and operation condition and provide you testing data report of installation.
Sara
Mobile phone : 0086137 8347 1727