Mining Machine for Rock Gold, Alluvial Gold Mining Machine

Model No.: Gp-1
Structure: Gold Plant
Price: Factory Price
Delivery: Sea Transportation
Drawing Documennt: Offer
Installation: Engineer Oversea Service
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
50-500T/D
Guarantee
1 Year (Wearing Parts Excluded)
Spare Parts
1 Year for Free
Sale After Service
Supply for Whole Using Time
Certification
Ce:Cmhn1305132313 ISO9001:2008
Transport Package
Export Standard
Specification
International standard
Trademark
HengXing
Origin
Henan China
Production Capacity
40-80tph

Product Description

Mining Machine For Rock Gold ,Alluvial Gold Mining Machine :
 
we mainly process equipments for such gold: 1 rock gold 2 alluvia gold

General flow process for processing rock gold:(design may vary when gold nature different)

 Four Steps Of  gold ore plant(Gold ore,Iron ore)

Step1:Crushing-- Put the ingredients broken 
      1)process introduction: Due to the volume of ore produced is too large , so it is necessary to the mined ore crushing. In this process , send the ore into the crushing device to crushed . In general, The System requirements of the ore particle size for general 12mm------18mm.
       2).Main Equipment:  Jaw crusher,impact crusher,hammer crusher,cone crusher etc
   
Step2:Grinding--The processing of raw materials carefully
      1) Process introduction: In this process, we must first make clear the requirements for each ore solution particle standards, Based with the aid of various equipment, put all sorts of ore grinding to separation units required unit solution size.
 
      2).Main Equipment:Feeder,Ball Mill,Classifier, Overflow ball mill,etc.

             
Step3: Sorting --Select fine ore powder
         1).Process introduction: In the production process,not all the ore powder are in line with the standard . we need to filter the ore powder . In this process We use professional equipment to elect qualified concentrate powder from ore , eliminated does not meet the criteria for ore.
      2).Main Equipment:Mixing machine ,Flotate separator,shaking table,spiral chute,etc.

step4:Dehydration --Take off water in the ore
      1).Process introduction: Due to various constraints, after the front of several processes , there are always some residual moisture in the ore powder, then we need to pick out concentrate dehydration, to meet the requirements of transportation and smelting.
 
      2.)Main Equipment:Vacuum filter,Box pressure filter,Folding belt filter,Ceramic filter,Vacuum pump, Driving thickener,etc.

Mining Machine Wet Pan Mill Technical Parameters:
Model Specification    Input size(mm) Process ability
   (t/h)
Speed
(r/min)
Motor
(kw)
Weight
  (t)
1600 1600×400×±20  Less than 30mm 4 20-22 6-30 17
1500A 1500×400×±20   3 20-22 6-22 15
1500B 1500×350×±20   2.5-3 20-22 6-22 14
1500C 1500×300×±20   2-2.5 20-22 6-22 12.5
1400 1400×250×±20   1.5-2 16-18 6-18.5 9.5
1300 1300×250×±20   1.5 21-23 6-15 7.8
1200A 1200×220×±20   0.9-1.2 16-18 4-7.5 6.0
1200B 1200×200×±20   0.8-0.1 21-23 4-7.5 5.8
1100 1100×200×±10   0.6-0.8 16-18 4-5.5 5.5
1000 1000×200×±10   0.5 21-23 4-5.5 4.5
900 900×150×±10   0.3 17-19   3 3.2

Contact:
Ms Sara Pang
Mobile phone :: 0086137 8347 1727
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now