Gold Extraction Mining Machine by Cyanide Process

Type: Carbon in Pulp Cyanide Process
Voltage: 440V
Weight: <1T
Material: Carbon Steel
Material Feature: Heat Resistant
Certification: BV, ISO9001:2008, ISO9001:2000
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
2-50tph
Energy Saving
Energy Saving
Warranty
2 Years
Color
Green
Customized
Customized
Condition
New
Usage
Gold Ore Cyanide Leaching Process
Installation
Engineer Guide
Drawing
Supply
Motor Voltage
380V
Application
Rock Gold Ore Concentration
Recovery Rate
95%
Name
Gold Extraction Mining Machine by Cyanide Process
Transport Package
Standard Container, Small Parts by Wooden Box
Specification
50-500t/h
Trademark
HengXing
Origin
China
Production Capacity
5-500t/H

Product Description

Gold Extraction Mining Machine By Cyanide Process:

In This , we use processing 500 t of gold ore for one day as example:
 Gold Extraction Mining Machine by Cyanide Process
first Ores by the vibrating feeder get into the jaw crusher PE 400 * 600, after the primary crushing, ore get into the jaw crusher PEX250 * 1000 to the second crushing, PEX250 * 1000 and vibrating screen at the same time form a closed circuit system,
ores bigger than 20mm back to the crusher ,less than 20 mm ores by electromagnetic vibrating feeder enter into the ball mill, and also the ball mill and classifier 1500 * 9000 form a closed circuit system, solution then get into the hydrocyclones, bigger than 200 mesh particles into the second ball mill 1830 * 5500 regrinding.less than 200 mesh particles into the thickener,
 
After dealing with by the thickener, solution density reached 35-50%, then go into the leaching reaction tank , the first leaching tank to join the cyanide and need to control the PH 10-10.5,
on the last leaching tank to detection cyanide concentration detection, cyanide concentration of 0.03% to 0.06%, this line the leaching time is 24 hours at the same time adding activated carbon In the eighth leaching tank to adsorption, activated carbon flow movement to the fourth leaching tank, after activated carbon adsorption saturation, using carbon pump get out the activated carbon
 
Then use the electrowinning machine to process the loaded carbon, After that smelt to get the 99.99% gold. in this way the activated carbon can be recycled gold recovery rate can reach 97%.
tailings use filter pressure processing, water and sodium can be recycled, reduce the pollution and reduce the wastage of water
Gold Extraction Mining Machine by Cyanide Process
Gold Extraction Mining Machine By Cyanide Process Ball Mill Technical Parameters:
Model  shaft rotation speed
(r/min) 
Ball load
(t) 
Feeding size
(mm) 
Discharging size
(mm) 
Capacity
(t/h) 
Power
(KW) 
Weight
(T) 
Φ 900 × 1800  38  1.5  ≤ 20  0.075 -0.89  0.65-2  18.5  3.6 
Φ 900 × 2100  38  1.3-1.4  ≤ 15  0.075 -0.83  0.7-3.5  18.5  3.9 
Φ 900 × 3000  38
 
2.7  ≤ 20  0.075 -0.89 1.1-3.5  22  4.5 
Φ 1200 × 2400  32  3.8  ≤ 25  0.0745-0.6  1.5-4.8  30  11.5 
Φ 1200 × 2800 32  3.3-3.5  ≤ 25  0.0745-0.6  2-6  30  13 
Φ 1200 × 4500  32  ≤ 25  0.074 -0.4  1.6-5.8  45  13.8 
Φ 1500 × 3000  27  ≤ 25  0.074 -0.4  2-5  75  17 
Φ 1500 × 3500 27  6.75
-6.4
≤ 25  0.075 -0.4  3-7  75  17.5 
Φ 1500 × 4500  27  14  ≤ 25  0.074 -0.4  3.5-12  110  21 
Φ 1500 × 5700  27  15  ≤ 25  0.074 -0.4  3.5-8  115  24.7 
Φ 1830 × 3000 24  18  ≤ 25  0.074 -0.4  4-10  130  28 
Φ 1800 × 3600  24  10.6-11.35  ≤ 25  0.075 -0.4  5-22  130  33.5 
Φ 1830 × 7000  24  25  ≤ 25  0.074 -0.4  7.5-17  210  36 
Φ 2100 × 3600  22  14-15.2
 
≤ 25  0.075 -0.4  15-36  370  46.8 
Φ 2200 × 5500  21  30  ≤ 25  0.074 -0.4  10-20  210  48.5 
Φ 2200 × 6500  21  31  ≤ 25  0.074 -0.4  14-26  380  52.8 
Φ 2200 × 7500  21  33  ≤ 25  0.074 -0.4  16-29  380  56 
Φ 2400 × 3000  20.6  15.5
-16.6 
≤ 25  0.075 -0.4  22-24  245  59 
Φ 2400 × 4500  21  30  ≤ 25  0.074 -0.4  8.5-60  380  65 
Φ 2700 × 3600  20.6  39  ≤ 25  0.074 -0.4  12-70  400  91.3 
Φ 2700 × 4000  20.7  40  ≤ 25  0.074 -0.4  12-80  400  94 
Φ 2700 × 4500  20.7  48  ≤ 25  0.074 -0.4  12-90  430  102 
Φ 3200 × 4500  18  65  ≤ 25  0.075
-0.4
according to the technics 800  137 

Gold Extraction Mining Machine By Cyanide Process
1. Large inhaling capacity and low consumption.
2. Complete flotation circuit with inhaling air and slurry
3. Process is easy to be changed.
4. Reasonable circulation of slurry decreases coarse sand sedimentation.
5. Automatic controlling device makes adjustment more convenient.

Our Factory :
Gold Extraction Mining Machine by Cyanide Process


Contact:
Ms Sara Pang
Mobile phone: 0086137 8347 1727
 
 
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now