Gold Member Since 2010
Audited Supplier
Zhengzhou Hengxing Heavy Equipment Co., Ltd.

Gold Mining Plant, Gold Cyanide Leaching Plant, Gold Cyanide Leaching Process manufacturer / supplier in China, offering Rock Gold Ore Mining Plant with Cyanide Leaching Process, Reliable Quality Hammer Type Coal Crusher Price, China Factory PF 1007 Secondary Stone Crushing Equipment Impact Crusher Machine and so on.

(/ )

Rock Gold Ore Mining Plant with Cyanide Leaching Process

FOB Price: US $50,000 / set
Min. Order: 1 set
Min. Order FOB Price
1 set US $50,000/ set
Get Latest Price
Port: Qingdao, China
Production Capacity: 5-500t/H
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: 50tpd-500tpd
  • Motor Type: AC Motor
  • Rotationl Speed: 21-23r/min
  • Materials: Gold
  • Usage: Gold Ore Cyanide Leaching Process
  • Drawing: Supply
  • Trademark: HengXing
  • Specification: 50-500t/h
  • Type: Ball Mill
  • Motor Power: 30KW
  • Application: Mine
  • Condition: New
  • Installation: Engineer Guide
  • Motor Voltage: 380V
  • Transport Package: Standard Container, Small Parts by Wooden Box
  • Origin: China
Product Description
Rock Gold Ore Mining Plant With Cyanide Leaching Process

In This , we use processing 500 t of gold ore for one day as example:
 
first Ores by the vibrating feeder get into the jaw crusher PE 400 * 600, after the primary crushing, ore get into the jaw crusher PEX250 * 1000 to the second crushing, PEX250 * 1000 and vibrating screen at the same time form a closed circuit system,
ores bigger than 20mm back to the crusher ,less than 20 mm ores by electromagnetic vibrating feeder enter into the ball mill, and also the ball mill and classifier 1500 * 9000 form a closed circuit system, solution then get into the hydrocyclones, bigger than 200 mesh particles into the second ball mill 1830 * 5500 regrinding.less than 200 mesh particles into the thickener,

 
After dealing with by the thickener, solution density reached 35-50%, then go into the leaching reaction tank , the first leaching tank to join the cyanide and need to control the PH 10-10.5,
on the last leaching tank to detection cyanide concentration detection, cyanide concentration of 0.03% to 0.06%, this line the leaching time is 24 hours at the same time adding activated carbon In the eighth leaching tank to adsorption, activated carbon flow movement to the fourth leaching tank, after activated carbon adsorption saturation, using carbon pump get out the activated carbon
 
Then use the electrowinning machine to process the loaded carbon, After that smelt to get the 99.99% gold. in this way the activated carbon can be recycled gold recovery rate can reach 97%.
tailings use filter pressure processing, water and sodium can be recycled, reduce the pollution and reduce the wastage of water
Rock Gold Ore Mining Plant with Cyanide Leaching Process
Rock Gold Ore Mining Plant with Cyanide Leaching Process

Rock Gold Ore Mining Plant with Cyanide Leaching Process
Contact:
Ms Sara Pang
Mobile phone: 0086137 8347 1727
 
 
 
 
Send your message to this supplier
Avatar
Ms. Sara Pang
Sales Manager
*From:
To: Ms. Sara Pang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now